- Date: August 2025.
- Location: Point Peter – Mount Kenya National Park, Kenya.
- Route: Sirimon.
- Start & Finish Point: Old Moses Camp.
- Duration: 3 Days.
- Total Distance: 32 km.
- Min. Elevation: 3,300 m.
- Point Peter Elevation: 4,757 m.
- Elevation Gain: 1,850 m.
DAY 1: Old Moses Camp (3,300m) to Shipton’s Camp (4,200m).
– Distance: 14 km.
– Time: 6 hrs.
DAY 2: Shipton’s Camp – POINT PETER (4,757m) – Shipton’s Camp.
– Distance: 4 km.
– Time: 8 hr 20 min.
– Technical Rock Climbing: 3 Pitches.
My first technical peak.
We left Shipton’s Camp at 7:40am. Reached the base of Point Peter at 10:00am. Started the technical climb and summited Point Peter (4,757m) at 12:08pm. Descended back to Shipton’s Camp at 4:00pm.
DAY 3: Shipton’s Camp to Old Moses Camp.
– Distance: 14 km.
– Time: 4 hrs.